London Brent Cross (LON01)

A 90MW data centre campus in the heart of London.

Our Brent Cross campus was acquired in 2020. The project has full planning permission and power secured for 90MW. Building 1 (20MW) is fully operational with four data halls, and Building 2 (70MW) is currently under construction.

The site has planning permission for what will be one of the world’s largest living walls. Over 750,000 plants will wrap around Building 2 to reduce noise and air pollution, as well as encourage biodiversity of insects and birds next to Brent Reservoir’s Site of Special Scientific Interest (SSSI).

LON01 has achieved its Platinum zero-waste-to-landfill certificate and uses hydrotreated vegetable oil (HVO) in place of diesel for our backup generators. Over the initial period of construction we expect to invest over £1 billion, boosting the local economy and employment.

At a glance

Land area:

8.92 acres

DC buildings:

2

Building size:

86,527 SQM

Status:

Building 1: Live, Building 2: Fully permitted and under construction

WUE:

Water usage effectiveness – closed loop system

PUE:

1.29 average annualised power usage effectiveness

Sustainability:

We have replaced diesel for Hydrotreated Vegetable Oil (HVO) fuel for our backup generators, removing our reliance on fossil fuel.

Local economy:

We expect to add £215 million to Brent’s GDP during the construction phase

Jobs:

We’ve created over 1,500 jobs to date, and a total of 3,380 job-years of employment, which include local apprenticeships