London Brent Cross (LON01)

A 90MW data centre campus in the heart of London.

Our Brent Cross campus was acquired in 2020. The project has full planning permission and power secured for 90MW. Building 1 (20MW) is fully operational with four data halls, and Building 2 (70MW) is currently under construction.

The site has planning permission for what will be one of the world’s largest living walls. Over 750,000 plants will wrap around Building 2 to reduce noise and air pollution, as well as encourage biodiversity of insects and birds next to Brent Reservoir’s Site of Special Scientific Interest (SSSI).

LON01 has achieved its Platinum zero-waste-to-landfill certificate and uses hydrotreated vegetable oil (HVO) in place of diesel for our backup generators. Over the initial period of construction we expect to invest over £1 billion, boosting the local economy and employment.

At a glance

Land area:

8.92 acres

DC buildings:

2

Building size:

86,527 SQM

Status:

Building 1: Live, Building 2: Fully permitted and under construction

WUE:

Water usage effectiveness – closed loop system

PUE:

1.29 average annualised power usage effectiveness

Sustainability:

We have replaced diesel for Hydrotreated Vegetable Oil (HVO) fuel for our backup generators, removing our reliance on fossil fuel.

Local economy:

We expect to add £215 million to Brent’s GDP during the construction phase

Jobs:

We’ve created over 1,500 jobs to date, and a total of 3,380 job-years of employment, which include local apprenticeships

"What makes Pure DC unique is that we can offer hyperscale customers something that almost never exists in the London market — the ability to launch a fully redundant three-site availability zone within the same metropolitan area. For cloud providers deploying the next generation of AI inferencing infrastructure, that level of immediate scale and resiliency is incredibly valuable.”

Gary WojtaszekExecutive Chairman & Interim CEO of Pure DC